Skip to main content

Park Indusrty – Sofia East

About the project

  • Investor
  • Park Indusrty – Sofia East
  • Локация
    Elin Pelin Municipality, Sofia region
  • Year
    2017
  • Area
    31 474,52 sq.m.
Category

The site is IIIrd category

Description

LOGISTIC WAREHOUSE OFFICE is divided into two stages: Stage I – Logistic warehouse – Building 1, comprising: two storage areas – loading and unloading area, two office buildings with domestic and sanitary premises in the building volume serving the installation level with ZP 18 805,36m2 and a total built-up area of 21 474,52m2 and Stage II – Logistic warehouse – Building 2, comprising two storage areas – two office buildings with public and sanitary facilities in the building volume, servicing the installation level with 18 805,36m2 and a total built-up area of 21 474,52m 2; site electric and plumbing networks; Vertical planning and flooring; Support wall; Landscaping.

Stage I was put into operation in 2016, and Stage II in 2018.

Scope of work of S Consult Ltd.:

  • Construction supervision
  • Technical passport

    Do you need more information about project like this?

    Qualitative and lawful construction process

    office@sconsultbg.com

    Always an accurate answer

    Adress


    1680 Sofia
    Bulgaria Blvd. 98
    ‘’Astra’’ Building
    Entrance V, 1st floor, office 13V